Airport Ground Support Equipment

Airport ground support equipment (GSE) is well-suited for electrification because it benefits from low-end torque and has frequent start/stops, idle time, and short required ranges. Efficient, quiet, and zero-emission, electric GSE can be more economical and beneficial to the ground crew. All-electric versions of most types of airport GSE – e.g., pushbacks, belt loaders, container loaders, luggage tugs, lavatory trucks, and water trucks – are increasingly being developed and deployed at US airports. 

There are several companies already developing a wide range of GSE. Two of the leaders in all-electric GSE include Aero Specialties (offering a large selection of equipment from belt loaders and service carts up to aircraft tow tractors and pushbacks) and OshKosh AeroTech (working on many different types of GSE, specifically, their towbarless aircraft tow tractors). Mallaghan is another manufacturer with a wide range of electric GSE.

Motrec’s MC-480 all-purpose 48V baggage vehicle offers a capacity of up to 6,000lbs. Textron and Charlatte have worked to produce full-size and intermediate belt loaders that can work to best fit operations. With up to 60,000lbs of towing power, the Tiger Li-Ion electric tow tractor can fill your more heavy-duty towing needs on the tarmac. 

Case study:

Q&A: Delta Air Lines on electrifying ground support equipment at Denver International Airport

From 2024 to 2025, Delta received four grants from the Colorado Clean Diesel Program (CCDP) to help purchase six electric baggage tugs and seven electric belt loaders.

Early adopters like Delta are crucial for bolstering the growing electric GSE industry. They provide market validation and potential for scaling up, which can eventually lower costs. Read more…

Charging Your Equipment

The vehicle’s onboard battery must be periodically recharged; in an airport setting, this can actually provide more flexibility and efficiency than diesel refueling. OshKosh AeroTech is developing its AmpCart, a towable charging station for eGSE. 

Applicants seeking funding for this technology must demonstrate that there is adequate electrical infrastructure to charge the equipment on site.